On the Critical Path

On the Critical Path

On the Critical Path


(6 desde 35 usuarios)

0h 22m 1971 HD

Watch on the critical path full movie online. Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.

On the Critical Path (1971)
Tags:   #On the Critical Path 1971   #On the Critical Path cuevana 3   #On the Critical Path pelispedia   #On the Critical Path pelisgratis   #On the Critical Path gnula   #On the Critical Path miradetodo   #On the Critical Path repelisplus   #ONF | NFB   #nuclear power   #candu

Comentario

User

Relacionados